Camp Creek at Glen EyrieDescription of Project:  The purpose of this project was to mitigate potential flood waters in Camp Creek from damaging the grounds at Glen Eyrie.  It included three phases.  Phase 1A major items included water control, excavation to subgrade, installing 24", 30", and 48" grouted boulders, install 2 ConSpan Arches, re-paving, and removal of 4 bridges.  Phase 1B major items included excavation to subgrade, 24" and 48" grouted boulders, install ConSpan Arch, remove 1 bridge, re-paving. Phase 2 included excavation to subgrade, 24" grouted boulders, remove 1 bridge, and re-paving