River Jobs - ERC - Eagle River
Owner: Town of Minturn, CO
Engineering Firm: Ecological Resource Consultants, Inc.
Project Foreman: Jesse Ellis, Tezak Heavy Equipment
Job Description: This project is located in the town of Minturn, CO. This project was made possible by the Natural Resource Damage Funds. It consists of 7,750 Linear Feet of restoration of the Eagle River. The work consists of the following: INSTREAM IPROVEMENTS: 10,400 CY's of Channel Regrading, 16 Each Riffle/Pool/Glide Sequences, 3,000 Tons of Boulders, REVEGETATION: 48,396 Each Wetland/Riparian Plugs, 3,039 5-Gallon Shrubs, 108,900 SF of Terrace and Slope Seeding, 40 Each 8-Foot Spruce Trees, 40 Each 12-Fott Spruce Trees, 30 Each 2.5-Inch Narrowleaf Cottonwoods, 12,100 SY of Erosion Control Blanket.