CDOT -State HWY 120- Hardscrabble Creek Bridge

Owner: Colorado Department of Transportation
Region 2 - South Program
CDOT Project Engineer: Brian Barrera, EIT
Project Superintendent: Troy W. Adair, Tezak Heavy Equipment
Project Location: Fremont County - SH 120 Between Mile Post 2.58 and Mile Post 2.94
Construction Start Date: December 6, 2008
Duration: 110 Calendar Days

Project Description: This project consists of the following: Removal and replacement of existing steel bridge structure K-16-Q and removal of existing concrete bridge structure K-16-R, which includes a temporary road detour, HMA Overlay, Full Roadway Reconstruction, New Box Girder Bridge Structure, Guardrail, Seeding, Soil Conditioning, Signing and Striping.