Fountain Creek at El Pomar Sanitary Sewer Crossing Stabilization and Fishway Project

Owner: Colorado Springs Utilities
Location: Fountain Creek at El Pomar
Superintendent: Jody Lazor
Start Date: August 2011

Project description: Colorado Springs Utilities has contracted with Tezak Heavy Equipment to install a grouted sloping boulder drop structure and fish ladder immediately downstream of an existing 48" wastewater interceptor. The wastewater main encasement has become exposed due to erosion of the channel. The drop structure is being constructed to re-establish the cover over the existing wastewater infrastructure.