17PWD Post Wide Dam Repairs

Description of Project:  Teller Dam Outlet Works Tower: Removal of portions of the existing tower, engineering, structural concrete, 42’x42’ manual slide gate, trash rack, riprap, and water control. Townsend Dam: trimming of vegetation, repair of erosion gullies, erosion control blanket, erosion control logs, and construction of a channel at the seepage drain. Spring Branch Dike: trimming of vegetation, repair of erosion gullies, removal of blockage and reinstallation of beaver deceiver pipes.