18 JCC Kiowa East Fork Jimmy Camp Creek Bid 020918

 Description of Project: This project includes Earthwork, Riprap, Conspan Bridge, and Concrete Work on the East Fork Jimmy Camp Creek Channel.

The final constructed project included the following major materials:

  • Mobilization
  • Contech O-848 Precast Bridge(install only)
  • Structural Concrete and steel reinforcing
  • HP 14x73 Piles
  • Wing wall and Headwall handrails
  • Select Backfill Over Precast Bridge
  • Structure Excavation
  • Structure Backfill CDOT Class 1
  • Type 3 Guardrail
  • Low Flow Channel Section A
  • Low Flow Channel Section B
  • Grouted 24” Diam. Boulders
  • Grouted 36” Diam. Boulders
  • Grouted Type M Riprap
  • Type L Soil Riprap
  • Type M Soil riprap
  • Earthwork cut to fill
  • Excavation ( Cut to waste onsite within 2000 FT)
  • Gravel Maintenance Trail
  • Pavestone Access Ramp – 1600 Seeding and Mulching