18 LBB Kiowa Lorson Blvd. Bridge

Description of Project: Concrete bridge structure replacement and construction.

The final constructed project included the following major materials:

  • Mobilization
  • Structure Excavation
  • Earthwork, Cut to fill(5391 CY from stockpile)
  • HP 14x73 Piles
  • Structural concrete and Steel Reinforcing
  • Type M Soil Riprap
  • Select Backfill over Precast Bridge
  • Wingwall and Headwall Handrail
  • Type 3 Guardrail
  • Interlocking paver access ramp