CSU Homestake Arkansas River Diversion

Description of Project: This project generally includes demolition and removal of an existing raw water intake, pipeline, and rock fill diversion dam with articulated concrete bock armoring, and construction of a reinforced concrete intake structure, steel pipeline, concrete diversion weir, and grouted boulder spillway, fish way, and boat chute, and other miscellaneous and appurtenant items as shown in the construction plans and specifications.

Project Major Quantities:

  • Mobilization
  • Erosion and Sediment Control
  • Access and Restoration
  • Dewatering, Diversion
  • Demolition
  • Upstream Riprap
  • Spillway and Fishway
  • Intake & Pipeline
  • Riprap