Douglas County Moonshine Gulch

Description of Project: Tezak Heavy Equipment will be repairing the Bayou Gulch Culvert by installing new piping and fixing and replacing current riprap material to avoid future washouts and improve culvert flows throughout the storm seasons.

Project Materials:

  • Unclassified Excavation
  • Sediment Control Log
  • Construction Fence
  • Remove and Replace Fence
  • Concrete Class D
  • Reinforcing Steel
  • 84” Corrugated Steel Pipe