Pikes Peak Greenway Trail Repair

Description of Project: The project primarily consists of reconstruction of eroded creek banks and trail surfaces at four locations to restore full function to the Greenway Trail located on the west bank of Fountain Creek between Janitell Road and a point on Fountain Creek located approximately 0.33 miles south of Circle Drive. Approximately 1,020 feet of creek bank is to be reconstructed with the project. The reconstructed creek banks are to be armored to mitigate erosion. The trail surfaces to be restored include a short segment of concrete and longer segments of crushed fines.