Sand Creek Stabilization

Sand Creek StabilizationDescription of Project: Restoration activities associated with the project in general include regrading of the channel banks and invert, filling the channel invert with onsite stockpiled material, installation of sheet pile and grouted boulder drop structures, placement of riprap
throughout the project, storm sewer pipe connections, plantings and revegetation, and
other miscellaneous work.

Project Major Quantities:
• Erosion and Sediment Control
• Import Structural Fill
• Grouted Boulders
• Pilot Boulders
• Type L Riprap
• Type II Bedding
• 4 Foot Access Trail