Sand Creek Stabilization at West Fork Confluence Karr 2

Sand Creek West ForkDescription of Project: The purpose of the project is to stabilize a degrading reach of Sand Creek near the confluence of the West Fork Sand Creek and the Main Stem Sand Creek to protect wastewater and water mains crossing Sand Creek. Stabilization will be accomplished through the installation of a grouted boulder drop structure and bank protection. The project area is 675’ long and extends from bank to bank, roughly 130 ft. wide, with the beginning near the confluence.