Westerly Creek ImprovementsDescription of Project:  Tezak Heavy Equipment has been selected as part of the design team for the Westerly Creek Improvements Project.  Purpose: Retrofit 3 reaches of the Westerly Creek corridor to include channel sinuosity, riparian elements, shallow overbanks, and concrete pedestrian path.  Major work items: Nearly 1,200 lf of stream restoration work and adjacent concrete path installation.  Major work items include grading, water control, soil riprap installation, concrete and asphalt removal, asphaltic pavement, boulder walls, re-vegetation, and site furnishings.   Project Location: The project is located along Westerly Creek bounded on the south by 11th Avenue and on the North by 13th Avenue.  Major nearby cross streets are Yosemite Street 2 blocks to the east and E. Colfax Avenue 2 blocks to the North.