Current Jobs
Sand Creek Stream Stability Improvements @ Academy Boulevard
Owner: City of Colorado Springs
Project Engineer: Steve Jacobsen, P.E., City of Colorado Springs
Superintendent: Jody Lazor, Tezak Heavy Equipment
This project consists of the following work: Mobilization, Water Control & Dewatering, Erosion & Sediment Control, Removal of Structures & Obstructions, Clearing & Grubbing, Unclassfied Excavation, Rock Excavation, Embankment Fill w/Onsite Materials, Embankment Import, 48" Boulder Grouted Drop Structure, 60" Grouted Boulders, 72" - 84" Feature Boulders, Exposed Type H Soil Rip Rap, Buried Type H Soil Rip Rap, Seeding & Fertilizing (Mulch & Matting), and a Structural Concrete Cut-Off Wall.
City of Lamar - Water System Improvements
Project Name: Water System Improvements - Phase II - 24" Transmission Line
Owner: City of Lamar, CO
Location: Lamar, CO
Construction Start Date: Late January of 2010
Superintendent: Troy W. Adair, Tezak Heavy Equipment
Project Description: This project includes, but is not limited to:
1. Approximately 11,000 feet of 24-Inch water transmission line and appurtenances.
2. Bore Across CDOT HWY 287.
3. Hot-taps and Line-stops and conventional in-line valves.
4. Creek and Wetland Crossing.
5. Connections to the existing water system, including smaller diameter pipe and appurtenances.
6. Relatively complicated construction sequencing requirements.
CDOT - State HWY 92 - BUCKWHEAT WAY
Owner: Colorado Department of Transportation
Region 3, Montrose Residency
Project No.: ES3-092A-022
Location: SH 92, Delta County, CO
Superintendents: Troy W. Adair & Jody Lazor, Tezak Heavy Equipment
Construction Start Date: Mid July of 2009
NOTICE: PROJECT IS ON A WINTER SHUTDOWN PERIOD UNTIL APRIL OF 2010
Project Description:
This project is located on SH 92 in Delta County, CO. This project begins at MM 9.7 and extends easterly approximately 4.12 miles to MM 13.82. The work will consist of reconstruction and minor realignment with inclusion of new climbing lanes and paved shoulders. Work includes mobilization, excavation and embankment, drainage culvert replacement, ABC Class I and ABC Class 6, HMA Paving, Construction Surveying, Box Culvert, Seeding/Mulching, Traffic Control Management and Final Signing and Striping.
Existing Site Photos:
Progress Photos: