Current Jobs
River Jobs - ERC - Buffalo Peaks
Engineering Firm: Ecological Resource Consultants, Inc.
Project Foreman: Jesse Ellis, Tezak Heavy Equipment
Job Description: This project is located south of Fairplay, CO on HWY 9 @ Buffalo Peaks Ranch. This project consists of approximately 9,000 LF of stream channel restoration for trout habitat and stream bank stabilization.
Existing Site Conditions:
Progress Photos:
Cottonwood Creek Phase 3
Owner: City of Colorado Springs
Project Engineer: Steve Jacobsen, P.E., City of Colorado Springs
Tezak Superintendent: Jody Lazor
Construction Schedule: March of 2008 Through August of 2008
This project consists of the following work: Earthwork Excavation, 3 NewDrop Boulder Structures (Grouted), Concrete Cut-off Walls, Armoring Slopes with Rip Rap, Seeding, Mulching, Erosion Control Blanket, Storm Sewer Pipe, and Manholes. Cottonwood Creek is located in Colorado Springs between Union Boulevard and Rangewood Street. Phase I Construction of Cottonwood Creek was completed in May of 2006. Phase II Construction of Cottonwood Creek was completed in March of 2007. Cottonwood Creek Phase 3 will tie-in Phase I and Phase II Construction.
Existing Site Conditions:
Progress Photos:
CDOT - State HWY 114 - Tomichi Creek Bridge
Owner: Colorado Department of Transportation, Region 3- Montrose
Project Manager: Dave Boronda, CDOT
Superintendent: Troy W. Adair, Tezak Heavy Equipment
Construction Schedule: May of 2008 Through May of 2009
Project Description:
This project is located on SH 114 near the intersection at US 50 and extending approximately 0.15 miles southerly. The work will consist of the following: Bridge replacement which includes clearing and grubbing, embankment material, seeding and mulching, aggregate base course, hot mix asphalt, concrete class D (Box Culvert), guardrail, bridge rail, striping, and construction traffic control.
Existing Site Conditions:
CDOT- State HWY 24
Owner: Colorado Department of Transportation, Region 3
CDOT Project No. HPP 0241-045
Project Engineer: Clinton Moyer, P.E. CDOT
General Superintendent: Danny Tezak, President (Tezak Heavy Equipment)
Construction Schedule: March 24, 2008 Through September 24, 2008
Project Description:
This project is located on State HWY 24, from approximate mile marker 169.0 to mile marker 174.1 in Lake County, just north of the Town of Leadville, CO. The project consists of shoulder and curve widening, minor reconstruct and resurfacing including HMA, HBP reclamation, aggregate base course, removal and installation of guardrail, unclassified excavation, seeding, signing, striping, construction traffic management, removal of an existing structural plate pipe, and the construction of a new Con-Span Bridge System. CDOT, Region 3 has partnered with Tezak Heavy Equipment and accepted a Valued Engineering Proposal, which will replace the proposed construction of a concrete box culvert with a new innovative Con-Span Bridge Design System. This new pre-cast bridge system that will be provided by Contech Bridge Solutions, Inc. will not only minimize the construction time, but it will also minimize the environmental impact by not having to divert the East Fork Arkansas River for the construction of this new bridge system.
CONSTRUCTION PROGRESS: The Pre-Cast Bridge Structure has been installed. Our crews are in the process of backfilling the structure and will re-open HWY 24 for the traveling public on May 2, 2008.
Existing Site Conditions:
Progress Photos:
Cranberry Park Subdivsion
Owner: DCS Development
Superintendent: Troy W. Adair
Cranberry Park Subdivision is located in Canon City. This subdivision project started in early October of 2007 and is scheduled to be completed in February of 2008. We have been contracted by D.C.S Development & Construction, LLC to perform the following work: Earthwork, Utilities, Asphalt Paving, Curb and Gutter, and Concrete Sidewalk. This new subdivision will house maintenance free luxury townhomes.
Progress Photos: