PCD Railroad Crossing

Description of Project: Fully functional track crossing replacement, installation of new railroad warning/signal system, improving pavement approaches, associated electrical infrastructure installation and traffic control. All work shall be in compliance with the specifications and construction drawings associated with that particular part.

Project Materials:

  • Mobilization
  • Equipment Maintenance
  • Erosion Control
  • Clear & Grub
  • Sawcut Asphalt
  • Remove Existing Asphalt
  • Excavation to Subgrade
  • Scarify, Compact, & finish subgrade
  • Road Base 
  • Asphalt Paving (8”thick)
  • Asphalt Paving (14” thick
  • Signs