PCD Railroad Crossing

Description of Project: Fully functional track crossing replacement, installation of new railroad warning/signal system, improving pavement approaches, associated electrical infrastructure installation and traffic control. All work was in compliance with the specifications and construction drawings associated with that particular part.

Project Materials:

  • Mobilization
  • Equipment Maintenance
  • Erosion Control
  • Clear & Grub
  • Sawcut Asphalt
  • Remove Existing Asphalt
  • Excavation to Subgrade
  • Scarify, Compact, & finish subgrade
  • Road Base 
  • Asphalt Paving (8”thick)
  • Asphalt Paving (14” thick
  • Signs