US50B Scour Critical Countermeasures

Description of Project: This was a scour countermeasure project under CDOT structures: K-18-BY & K-18-BZ on US50B at MP 318 on the east side of Pueblo, Colorado.  Project work consisted of repairing existing scour with fill material and constructing a scour preventative grouted boulder drop structure.

Project Owner: Colorado Department of Transportation

Tezak Heavy Equipment:
Overall Management: Danny Tezak
Engineer/Estimator: Bryan Danner
Health and Safety Manager: Dean Burns
Project Manager: Brandon Houser
General Superintendent: Troy Adair
Project Superintendent: Keith Martinez

Project Major Activities:

  • UNCLASSIFIED EXCAVATION
  • EMBANKMENT MATERIAL
  • BLADING
  • DOZING
  • COMBINATION LOADER
  • STRUCTURE EXCAVATION
  • STRUCTURE BACKFILL
  • TOPSOIL
  • STOCKPILE TOPSOIL
  • EROSION LOG
  • ROCK CHECK DAM
  • EROSION CONTROL MANAGEMENT
  • WATER CONTROL
  • SEEDING
  • SOIL CONDITIONING
  • MULCHING
  • MULCH TACKIFIER
  • SOIL RETENTION BLANKET
  • GEOTEXTILE
  • STEEL SHEET PILING
  • SOIL RIPRAP
  • GROUTED RIPRAP SLOPE AND DITCH PAVING

Project Location: Pueblo County

Contract Amount at Award: $570,845.95

Tentative Start Date: September 10, 2020

Actual Start Date: September 10, 2020

Anticipated End date: November 30, 2020

Actual End Date: Novemember 7, 2020

Subcontractors: Ground Engineering, Mod Squad, Edward James Surveying, Smelker Concrete, T-P Enterprises, The Idea Marketing

Northern Water Supply Project North Booster Pump Station Overflow Channel
Read more
Fountain Creek Stabilization at Hanson Trailhead Project
Read more
Templeton Gap @ Siferd Blvd. Stream Stabilization
Read more
Timber Ridge Multi-plate Structure, Sheetpile Check Structures and Channel Bank Stabilization
Read more