CDOT I-25 BRIDGE REPLACEMENT

Project Owner: Colorado Department of Transportation

Tezak Heavy Equipment:

Overall Management: Danny Tezak
Engineer/Estimator: Bryan Danner
Health and Safety Manager: Dean Burns
Project Manager: Brandon Houser
General Superintendent: Troy Adair
Project Superintendent: Keith Martinez

Description of Project: 

  • Bridge Removal of structure K-18-U
  • Construction of CBC structure K-18-UA
  • Construction of a 2 lane SB 1-25 detour
  • Removal of 2 lane SB 1-25 detour

Project Major Activities:

  • EMBANKMENT MATERIAL
  • BACKHOE
  • ADVANCE WARNING FLASHING OR SEQUENCING ARROW PANEL
  • NIGHT WORKING LIGHTING
  • SAWING ASPHALT MATERIAL
  • UNCLASSIFIED EXCAVATION
  • BLADING
  • STRUCTURE EXCAVATION
  • STRUCTURE BACKFILL
  • TOPSOIL
  • STOCKPILE TOPSOIL
  • EROSION LOG
  • EROSION CONTROL MANAGEMENT
  • RESET GROUND SIGN
  • SEEDING
  • SOIL CONDITIONING
  • MULCHING
  • SPRAY-ON MULCH BLANKET
  • BONDED FIBER MATRIX
  • SOIL RETENTION BLANKET
  • REMOVAL OF NESTS
  • AGGREGATE BASE COURSE
  • PAVING
  • EMULSIFIED ASPHALT
  • GEOTEXTILE (EROSION CONTROL)
  • RIPRAP
  • CONCRETE 
  • REINFORCING STEEL
  • GUARDRAIL
  • END ANCHORAGE
  • DELINEATOR
  • RUMBLLE STRIP
  • DETOUR
  • PAVEMENT MARKING PAINT 
  • MODIFIED EPOXY PAVEMENT MARKING 
  • FLAGGING
  • TRAFFIC CONTROL

 

Project Location: Pueblo County 

Contract Amount at Award: $2,071,985.91

Final Contract Amount: $2,071,985.91

Start Date: June 2nd, 2020

Anticipated End Date: Novemember 6th, 2020

Actual End Date: October 22nd, 2020

Subcontractors: A-1 Barricade & Sign, AA Accurate & Affordable Striping, Inc., Cascade Environmental, Inc., CPP Engineering Inc., Designer Columns & Piers Inc., Edward James Surveying, Ground Engineering, Hutton Concrete Cutting, The Idea Marketing Inc., Martin Marietta Materials, Montano Concrete, T-P Enterprises Inc., Trax Construction Inc.

 

Northern Water Supply Project North Booster Pump Station Overflow Channel
Read more
Fountain Creek Stabilization at Hanson Trailhead Project
Read more
Templeton Gap @ Siferd Blvd. Stream Stabilization
Read more
Timber Ridge Multi-plate Structure, Sheetpile Check Structures and Channel Bank Stabilization
Read more