Fountain Creek Channel Restoration in Pueblo at 13 th Street Project

Project Owner: Fountain Creek Watershed Water Activity Enterprise

 

Tezak Heavy Equipment:

Overall Management: Danny Tezak

Engineer/Estimator: Bryan Danner

Health and Safety Manager: Dean Burns

Project Manager: Brandon Houser

General Superintendent: Troy Adair

Project Superintendent: Jesse Ellis

 

Description of Project: The project includes approximately 1,500 feet of Fountain Creek from 8th Street to 13th Street in Pueblo, Colorado. The goals include the stabilization of five unstable bank segments identified as part of an extensive analysis of Fountain Creek.

 

Project Major Activities:

Mobilization

Traffic Control

Water Control and Dewatering

Erosion and Sediment Control

Clearing and Grubbing

Existing Asphalt Access Route - Remove & Dispose

Earthwork - Cut/Fill Onsite

Coir Fabric (KoirWrap 1200)

Coconut Blanket (Nedia C400B)

Soil Conditioner

Riparian Seeding

Upland Seeding

50% Riparian/50% Upland Seeding Mix

Willow Cuttings

Cottonwood Poles

Brush Layering

Riprap Bend Protection (Type VH)

Riprap Culvert Outlet Protection (Type H)

24" RCP Pipe

24" Outfall Structure W/ Rubber Check Valve

Storm 6' Manhole

 

Project Location: Pueblo County

Contract Amount at Award: $2,852,060.90

Final Contract Amount: Pending

Tentative Start Date: October 5, 2020

Actual Start Date: October 12, 2020

Anticipated End date: April 5, 2021

Actual End Date: Pending

Subcontractors: Edward James Surveying, Total Terrain, Montano Concrete, Work Zone Traffic Control

 

Northern Water Supply Project North Booster Pump Station Overflow Channel
Read more
Fountain Creek Stabilization at Hanson Trailhead Project
Read more
Templeton Gap @ Siferd Blvd. Stream Stabilization
Read more
Timber Ridge Multi-plate Structure, Sheetpile Check Structures and Channel Bank Stabilization
Read more