Niver Creek at Ruston Park

Project Owner: Urban Drainage and Flood Control District, D.B.A. Mile High Flood District: 2380 W. 90th Ave. Federal Heights, Co 80260, 1-303-428-3526.

 

Tezak Heavy Equipment:

Overall Management: Danny Tezak 

Engineer/Estimator: Bryan Danner

Health and Safety Manager: Dean Burns

Project Manager: Ben Borton           

General Superintendent: Troy Adair

Project Superintendent: Brad Frew / Tim Provost

 

Description of Project: The proposed park improvements will include drainage

improvements including drop structures, buried storm sewer, outlet structures, and a

detention pond. Additionally, other improvements will include concrete-paved trails and an asphalt-paved parking lot. Buried utilities may be installed to service the new facility.

 

Project Major Activities:

Traffic Control                                                  

Water Control and Dewatering                          

Earthwork, Imported Fill                                     

Aggregate Base Course                                     

Concrete Curb and Gutter with 1-Foot Pan         

Concrete Curb and Gutter with 2-Foot Pan         

Concrete Sidewalk / Trail, 6-Inch Thick              

Concrete Sidewalk / Trail - Fire Lane, 7-Inch Thick         

Concrete Stairs                                                 

Concrete, Retaining Walls at Overlook

Hot Mix Asphalt (6" HMA)                                 

9' Inlet Structure with Side Wall Grates (5'x8'x9') 5-10 Foot Depth          

24' Inlet Structure with Side Wall Grates (6'x6'x24') 5-10 Foot Depth      

Picnic Shelter at Educational Area                                  

Picnic Shelter at West Picnic Area                                  

Park Lighting                                                                

                                                                                                                      

Project Location: Douglas County

Contract Amount at Award: $2,499,668.07

Final Contract Amount: Pending

Start Date: 01/11/2021

Anticipated End date: 10/01/2021

Actual End Date: Pending

Subcontractors: Down to Earth Compliance, C&R Electrical Contractors, Asphalt Specialties, Edward James Surveying, MLL Concrete Construction, Work Zone Traffic Control

Dry Creek Stream Stabilization Phase II
Read more
Northern Water Supply Project North Booster Pump Station Overflow Channel
Read more
Fountain Creek Stabilization at Hanson Trailhead Project
Read more
Templeton Gap @ Siferd Blvd. Stream Stabilization
Read more
Timber Ridge Multi-plate Structure, Sheetpile Check Structures and Channel Bank Stabilization
Read more