McMurdo Gulch Stream Reclamation

McMURDO GULCH STREAM RECLAMATION PROJECT – PRIORITY 2 IMPROVEMENTS

Project Owner:  Town of Castle Rock

 

Tezak Heavy Equipment:

Overall Management: Danny Tezak
Engineer/Estimator: Bryan Danner

Health and Safety Manager: Dean Burns

Project Manager:  Don Berry

General Superintendent: Troy Adair

Project Superintendent: Brad Frew

Project Foreman: Mark Atwater

 

Description of Project: Stream channel improvements at four separate locations on McMurdo Gulch; grading, water control, boulder cascade drop structures, riffle drops and pools, bank protection, vegetation restoration, vegetation enhancement, erosion control measures, soil rip-rap, void filled rip-rap, erosion control blanket, seeding, plantings, mulching and related appurtenances.

 

Project Major Activities:

CLEARING & GRUBBING                                            

MOBILIZATION                                                           

SURVEYING                                                                

TRAFFIC CONTROL                                                     

WATER CONTROL                                                      

MATERIALS TESTING                                                  

REMOVE & RESET FENCE                                           

REMOVE CONCRETE SIDEWALK / TRAIL                    

REMOVE & REPLACE ASPHALT (ROAD)                     

CONCRETE SIDEWALK / TRAIL                                               

CONCRETE (CONCRETE SADDLE, REINFORCED)                                

CHECK DAM REINFORCED                                                     

CONCRETE WASHOUT AREA                                                  

SEDIMENT CONTROL LOG                                                     

SILT FENCE                                                                             

CONSTRUCTION FENCE                                                                     

CONSTRUCTION MARKER                                                      

STABILIZED ACCESS ROAD                                                     

VEHICLE TRACKING CONTROL                                               

EARTHWORK, EXCAVATION & FILL ON SITE                          

EARTHWORK, EXCAVATION AND HAUL OFF SITE                             

EXCAVATION MUCK, REPLACE WITH APPROVED MATERIAL

TOPSOIL, EXCAVATATE, STOCKPILE AND REPLACE               

21WPS Wilkerson Pass Safety Project
Read more
Williams Fork Dam Reservoir Access Improvements
Read more
Fountain Creek Stabilization at Hanson Trailhead Project
Read more
Templeton Gap @ Siferd Blvd. Stream Stabilization
Read more