McMurdo Gulch Stream Reclamation
McMURDO GULCH STREAM RECLAMATION PROJECT – PRIORITY 2 IMPROVEMENTS
Project Owner: Town of Castle Rock
Tezak Heavy Equipment:
Overall Management: Danny Tezak
Engineer/Estimator: Bryan Danner
Health and Safety Manager: Dean Burns
Project Manager: Don Berry
General Superintendent: Troy Adair
Project Superintendent: Brad Frew
Project Foreman: Mark Atwater
Description of Project: Stream channel improvements at four separate locations on McMurdo Gulch; grading, water control, boulder cascade drop structures, riffle drops and pools, bank protection, vegetation restoration, vegetation enhancement, erosion control measures, soil rip-rap, void filled rip-rap, erosion control blanket, seeding, plantings, mulching and related appurtenances.
Project Major Activities:
CLEARING & GRUBBING
MOBILIZATION
SURVEYING
TRAFFIC CONTROL
WATER CONTROL
MATERIALS TESTING
REMOVE & RESET FENCE
REMOVE CONCRETE SIDEWALK / TRAIL
REMOVE & REPLACE ASPHALT (ROAD)
CONCRETE SIDEWALK / TRAIL
CONCRETE (CONCRETE SADDLE, REINFORCED)
CHECK DAM REINFORCED
CONCRETE WASHOUT AREA
SEDIMENT CONTROL LOG
SILT FENCE
CONSTRUCTION FENCE
CONSTRUCTION MARKER
STABILIZED ACCESS ROAD
VEHICLE TRACKING CONTROL
EARTHWORK, EXCAVATION & FILL ON SITE
EARTHWORK, EXCAVATION AND HAUL OFF SITE
EXCAVATION MUCK, REPLACE WITH APPROVED MATERIAL
TOPSOIL, EXCAVATATE, STOCKPILE AND REPLACE