Gold Camp Interim Spillway Repair

Description of Project: Tezak Heavy Equipment will be repairing the concrete spillways on Gold Camp Reservoir.

Project Material Quantities:
• Concrete Coring 
• Concrete Slab Repair type 1A 
• Concrete Slab Repair Type 1B 
• Seeding Sub (blanket) 
• Compressive Strength Cylinders 
• Field Testing and Sampling