Ken Mitchell Lakes Cell 1 Inflow & Outflow Spillways

Ken Mitchell LakesDescription of Project: The Tezak Team designed and constructed two spillways, a riverside spillway and a lateral spillway, to allow for safe passage of flood waters through the reservoir based upon Urban Drainage standards. The spillways were constructed using grouted riprap with geotextile separation between the riprap and the free draining material. The design-build team was responsible for all survey, environmental and geotechnical evaluations, civil design and construction necessary to complete a seamless, cost-effective, and timely project. Included were 30% conceptual progress plan-set, final construction drawings and specifications, permit requirements, geotechnical assessment reports, shop drawings/specs, as-build drawing/specs and construction as per plans and specifications.