Pikes Peak Greenway Trail Repair

Description of Project: The primary purpose of this project was to restore the trail’s full function by reconstructing the eroded creek banks and trail surfaces at four locations along Greenway Trail. This project was located along the west bank of Fountain Creek between Janitell Road and roughly 0.33 miles south of Circle Drive. Approximately 1,020 feet of creek bank was reconstructed and armored to mitigate erosion. The trail surfaces were restored to include a short segment of concrete and longer segments of crusher fines