Pioneer Natural Resources Drainage Repairs

Description of Project: Pioneer Natural Resources contracted Tezak Heavy Equipment for the repair of approximately 16 drainage locations in the Long’s and Colorow Canyons damaged in recent flood events. Repairs were made to improve flows and minimize the potential for future washouts.  Major items included 4000 CY of excavation, 2400 CY of embankment, 400 LF 36” RCP, 600 LF 48” RCP, 80 LF of 60” RCP, 40 LF 72” RCP, 2200 CY riprap, 1500 tons of road base.