Aurora Rocky Ford Diversion Rehab

Description of Project: This projects consisted of excavation in the spillway channel, lining the spillway channel with articulated concrete blocks, construction of riprap lined stilling basin, leveling the dam crest, placing riprap on the upstream slop of the dam, rehabilitating the existing outlet works and installing settlement point/station markers on the dam crest.