CSU Homestake Arkansas River Diversion

August update:  Keith and his crew have placed a majority of the boulders in the boater passage and are prepping for the water line shut down to complete the tie in to the new line.

August Arkansas River Diverions

 

Description of Project: This project generally includes demolition and removal of an existing raw water intake, pipeline, and rock fill diversion dam with articulated concrete bock armoring, and construction of a reinforced concrete intake structure, steel pipeline, concrete diversion weir, and grouted boulder spillway, fish way, and boat chute.

Project Major Activities:

  • Mobilization
  • Surveying
  • Erosion and Sediment Control
  • Access & Restoration
  • Dewatering, Diversion, Care of Water
  • Demolition
  • Upstream Riprap
  • Weir
  • Spillway & Fish way
  • Divide Wall & Boater Channel
  • Intake and Pipeline
  • Access & Restoration
  • Intake and Pipeline