CSU Homestake Arkansas River Diversion

October update:  Crew is finishing up the boat chute, intake structure, and site utilities.

August Arkansas River Diverions

 

Description of Project: This project generally includes demolition and removal of an existing raw water intake, pipeline, and rock fill diversion dam with articulated concrete bock armoring, and construction of a reinforced concrete intake structure, steel pipeline, concrete diversion weir, and grouted boulder spillway, fish way, and boat chute.

Project Major Activities:

  • Mobilization
  • Surveying
  • Erosion and Sediment Control
  • Access & Restoration
  • Dewatering, Diversion, Care of Water
  • Demolition
  • Upstream Riprap
  • Weir
  • Spillway & Fish way
  • Divide Wall & Boater Channel
  • Intake and Pipeline
  • Access & Restoration
  • Intake and Pipeline