CSU Sand Creek Upstream Chelton Road

Description of Project: This project includes in-stream work to construct drop structure, bank stabilization, channel fill, site dewatering, installation of riprap, grouted boulders, riprap placement, contouring and grading.

 

 

Project Major Quantities:

  • Mobilization
  • Water Control & Dewatering
  • Erosion & Sediment control
  • 4’ DIA Grouted Boulders
  • Type H Soil Riprap
  • PZ – 22 Sheet Pile
  • Import Fill
  • Erosion Control Blanket